How to configure strength calculation?

Last Updated ·

You must have registered and installed the sensor before pouring. It's important to take note of the exact date and time at which the sensor was covered with concrete. Accurate start times increase the precision of concrete strength measurements.

To record when the sensor was covered with concrete in the web platform:

Step 1: Select the sensor previously registered on the platform. Then, click Calculate Strength on the bottom-left side of the graph.

Screenshot_2019-09-23_at_11.08.22.png

Step 2: Select in the calendar the day and time. You can also specify the milestone(s) for a sensor, to receive a notification when that strength is reached.

Screenshot_2019-09-23_at_11.11.28.png

To record when the sensor was covered with concrete in the app:

Select the correct pour and 'select pour time' on the target sensor

press 'select pour time'

Press select time and scroll through to the correct time the sensor (or tail) was covered in concrete

Don't forget to save

Related
Offline data collection
DeWalt Jobsite Setup
How do I add users to my site?
How do I switch between sites?
How to contact the DeWalt Support Team
How do I use the ConcreteDNA App on my iPad?
How do I restart the app?
How to contact the Converge Support Team
Which phone settings do I need to turn on?
Issues Collecting Data
Where should I place my sensors in the concrete for best results?
Check concrete performance?
How do I check what hardware is on my Signal site?
How do I check what hardware is on my Mesh site?
How to set up an alert about a specific strength or temperature?
How to get concrete monitoring reports?
Monitor temperature differentials in mass concrete?
Clearing your Cache and Cookies in Chrome
How to give access to a new user to the platform?
How do I Download the ConcreteDNA App?
How do I get my concrete mix loaded onto the app?
How do I create a "Pour"?
Maturity Curve Fitting Process
Maturity Functions

WE'RE HERE TO HELP

Still need help?